Maharashtra
Unleash Your Business Potential in MIDC with Maha Industry
Industrial Land / Plots for Sale in Chakan Phase 2 MIDC
Infrastructure
Water
Temporary water supply scheme: At present 3.00 MLD capacity water supply is made available from existing 120 MLD capacity Pimpri Chinchwad Industrial area water supply scheme.Permanent water supply scheme : MIDC has reserved 12 Cum water storage per year in the Andra dam of Irrigation department.This source is about 18 kms away from the industrial area.Water can be lifted from proposed K.T weir on the Andra river near Talegaon industrial area.The 7.50 MLD capacity water supply is ready for the Talegaon industrial area from which permanent water supply will be made available by laying the gravity main of about 20 km to Chakan industrial area.
Electricity
12.5 MVA Substation of MSEB already exists at the real estate prime location Chakan.
Power
12.5 MVA Substation of MSEB is already existing at MIDC Plot for Sale in Chakan Phase 2. The same could be augmented by MSEB to fulfil the power requirement.
Education
Cambridge level education at Lonavala with boarding and Pre-University ,Graduation and Post Graduation at Mumbai & Pune cities.
Get in touch with us.
Contact for sales
For other enquiry