Ranjangaon phase 3 Land/Plot For Sale, Rates

Infrastructure
Water

MIDC has constructed a water supply scheme at a cost of Rs.15 crores. The scheme is sourced by the Chinchani dam on the Ghod river and supplies 13.8 mld. water in the first phase. The water is purified at a WHO standard water treatment plant of 27.6 mld. within the park. This assures 24 hours water supply.

Roads

The park is located on Pune-Ahmednagar road at a distance of 50 Kms from Pune. It is connected internally by multiple lane roads of international standards with aligned pavements, underground drainage, underground cabling etc. The width of main road is 60 mt. and width of internal road is 30 mt.The roads are contructed using modern techniques.

Connectivity

A dedicated electronic telephone exchange, with 360 lines and 512 PC-DOT has been set up by the Department of Telecommunications with ISDN facility. The exchange is connected to Pune with Optical Fibre Cable for fast connectivity. Internet speed of upto 32 mbps can be obtained.

Residential Facilities

A 160 hectares residential area is reserved, out of which the first phase of 35 hectares has been developed on the eastern side of the park with basic facilities like water, electricity and roads. Plots are also being offered for construction of residential complexes. There is an additional 65 hectares of land which, as a buffer zone, separates the Industrial Area from the residential area. Additional land can be made available for the promotion of a number of recreational activities such as: Amusement parks, Golf course, Convention centres, Water sports, Arts and craft village and Resorts and other tourism facilities.

Common Effluent Disposal Facility

A common effluent treatment plant is commissioned having capacity of 11.5 MLD. An underground drainage collection and disposal system has already been installed.

Fire Station

A fire station has been constructed to handle any kind of disaster. It will be shortly handed over to the industries association of the area.

Truck Terminus And Bus Stop

A 20,000 sq.mts. area has been provided as a truck terminus, for parking transport vehicles. The terminus is managed through private participation and will help in handling the traffic congestion on the roads.

Electricity

A 220 kv substation, set up by MIDC and MSEB, provides power supply without voltage fluctuation to the area. This extra high voltage substation has a total capacity of 150 MVA. This has helped to get required power available to the consumer at 22kv / 132kv as well as to low tension consumers. Present consumption - 55 MVA. Surplus power - 95 MVA.

Streetlights

The entire Industrial Area is lit up by 2,000 street lights, which are fully operational. The lights on the internal roads are fitted up on 11metres high steel tubular poles whereas the junctions are illuminated with 30 metres high mast.

Bank

There will be a number of nationalised and foreign banks coming up in the area for the convenience of the investors.

Support Facilities

Executive hostels An executive hostel with 10 standard rooms and 5 air-conditioned rooms, with attached toilets, has also been made available. Similarly 5 dormitories, each having 8 beds with common toilet, are also being made available.

Hotel

The park has earmarked plots for the development of hotels in the area through private agencies.

Get in touch with us.
Head Office

Plan S Business Park, 2008, 20th Floor, Opp. DY Patil Stadium, MIDC Industrial Area, Nerul, Navi Mumbai, Maharashtra - 400706.

Branch Address

Plot E-4, Anand Nagar MIDC, Ambernath Industrial Area, Ambernath East,
Thane Dist, Maharashtra 421501.

Get in touch with us.